Energy and environmental management has always been of fundamental importance for our company.
Our focus is to monitor and reduce the consumption inside our plant, compensating the use of electricity with its production from renewable sources.
Aim that our company pursues by respecting, on every occasion, the values that distinguish us: quality, innovation, sustainability and passion.
We now have 12 renewable sites, all managed in full respect of the surrounding nature.

By the end of 2024, a further photovoltaic system will be built, the first on the ground for Poliplast S.p.A. which continually sets new sustainability goals.

10

Hydroelectric Plants

3

Photovoltaic System

23.4

Mw of installed power

60

Mln kw energy produced per year

42

Million kg CO2 not released into the environment

Our facilities


Hydroelectric plant “Fiumenero”

Category: Run-of-river hydroelectric
Location: Valbondione (BG)
Year: 1991
Power: 2000 kWp
Jump: 157 m
Maximum capacity: 1500 l/s
Turbines: 2 Pelton

Hydroelectric plant “Bagnola”

Category: Run-of-river hydroelectric
Location: VARALLO SESIA (VC)
Year: 1998
Power: 1100 kWp
Jump: 80 m
Maximum capacity: 940 l/s
Turbines: 1 Francis, 1 Pelton

Hydroelectric plant “Grabiasca”

Category: Run-of-river hydroelectric
Location: Gandellino (BG)
Year: 2006
Power: 2000 kWp
Jump: 325 m
Maximum capacity: 500 l/s
Turbines: 2 Pelton

Hydroelectric plant “Gosalda”

Category: Run-of-river hydroelectric
Location: Gosaldo (BL)
Year: 2012
Power: 2250 kWp
Jump: 503 m
Maximum capacity: 268 l/s
Turbines: 2 Pelton

Hydroelectric plant “Romna”

Category: Run-of-river hydroelectric
Location: Casnigo (BG)
Year: 2017
Power: 95 kWp
Jump: 6.25 m
Maximum capacity: 2100 l/s
Turbines: 1 Kaplan

Hydroelectric plant “Abetone Cutigliano”

Category: Run-of-river hydroelectric
Location: Abetone Cutigliano (PT)
Year: 2018
Power: 2800 kWp
Jump: 44 m
Maximum capacity: 6200 l/s
Turbines: 2 Francis

Hydroelectric plant “Mulino”

Category: Run-of-river hydroelectric
Location: Cavallermaggiore (CN)
Year: 2018
Power: 650 kWp
Jump: 5.40 m
Maximum capacity: 19000 l/s
Turbines: 1 Kaplan

Hydroelectric plant “Mollièrès”

Category: Run-of-river hydroelectric
Location: Cesana Torinese (TO)
Year: 2021
Power: 1500 kWp
Jump: 60 m
Maximum capacity: 2600 l/s
Turbines: 2 Francis

Hydroelectric plant “Torgnon”

Category: Run-of-river hydroelectric
Location: Torgnon (AO)
Year: 2023
Power: 2250 kWp
Jump: 466 m
Maximum capacity: 400 l/s
Turbines: 2 Pelton

Hydroelectric plant “Revello”

Category: Run-of-river hydroelectric
Location: REVELLO (CN)
Year: 2023
Power: 600 kWp
Jump: 67 m
Maximum capacity: 1150 l/s
Turbines: 1 Francis

Polo 3

Category: Fixed roof photovoltaic
Location: Casnigo (BG)
Year: 2023
Power: 580 kWp
Moduli: 410 Wp

Under construction

Polo 2

Category: Fixed roof photovoltaic
Location: Casnigo (BG)
Year: 2024
Power: 455 kWp
Moduli: 440 Wp

Under construction

Pisa

Category: Ground-mounted photovoltaic with uniaxial tracker technology (under construction)
Location: Pisa (PI)
Year: 2024
Power: 7120 kWp
Moduli: 620 Wp